Central Wisconsin Christian School
Excel takes pride in the growth that has taken place at Central Wisconsin Christian School (CWC) over the last two decades. Our partnership began in 1997 with a 22,600 sq. ft. addition to the existing high school. Since that initiative, our connection with CWC has thrived, with Excel assuming the role of their architectural and engineering partner for multiple projects.
2010 brought a 33,700 sq. ft. addition that reshaped the high school into a Pre-K through Grade 12 single campus facility. In 2013, we carried out another building alteration project that converted the existing high school library into a learning center.
Following this successful addition, we collaborated closely with CWC to envision the school's future and create a Master Plan outlining progressive building enhancement phases for the following years. As a result, our latest project has just concluded, perfectly aligning with the upcoming academic season.
At the center of the latest project is a 30,000 sq. ft. multifaceted addition featuring a workshop area, a weight room, locker rooms, classrooms, inviting collaborative zones, and an additional learning center.