MENU

Mount Olive Lutheran School

This project included multiple additions and renovations throughout the Pre-K through 8th-grade school. The first addition included the gymnasium, locker rooms, and an early childhood center. The initial phase also included the conversion of the existing gym into a commons and cafeteria space, and a kitchen was added. Other areas of alteration consisted of adding and renovating multiple classrooms. The addition was designed to accommodate a future second floor.

In-House Services
  • Architectural
  • Civil Engineering
  • Surveying
  • Structural Engineering
  • Plumbing Engineering
  • Mechanical Engineering
  • Electrical Engineering
  • Interior Design


Similar Projects
Central Wisconsin Christian School

You'll love working with us.

You'll love working with us.

You'll love working with us.
Who We Are
What We Do
What's New
Careers
File Transfer
100 Camelot Drive, Fond du Lac, WI 54935
920-926-9800
© 2026 Excel Engineering, Inc. All right reserved